We are serial entrepreneurs. Amazing people have allowed us to build companies, cultures and projects we are proud of.

est. 2016
Founded in 2016 by Helge Gallefoss and partners. The new digital highway connecting Norway to continental Europe. A 170km subsea fibre optic cable between Larvik and Hirtshals, and a 145km terrestrial cable laid between Oslo and Larvik. Thinking outside the box, recruiting a team who dared to challenge convention and being hands-on in every step, lead us to build on time, within a remarkable budget.
Sold to Altibox Carrier in 2020.

Project Think Tank
Accelerating the transition. Discover solutions and new standards onboard our 100ft platform. Vessel currently under construction.
est. 2011
An effort to repurpose parts of the old Norske Skog ASA mill, Saugbruks, into an industrial server farm utilizing the local hydropower and Fjord IT AS patented cooling designs. Due to poor fibre optic connectivity with continental Europe, and other challenges, the project could not proceed as planned. This inspired us to found Skagenfiber.
Sold to IP Group in 2015.

est. 2001 by Helge Gallefoss